Duval County ground is mostly fine sand. The Mandarin soil series, first described right here in 1977, is a good example: sand top to bottom, somewhat poorly drained, with a seasonal water table that can rise to within 18 to 42 inches of the surface. That shapes how we compact, how high we set the slab and how we stop moisture from wicking up.

The upside of sand is that it does not shrink and swell like some soils. Once it is compacted and drained properly, it makes a stable, even bearing surface. Most slab problems we see trace back to skipped compaction, buried organic material or a slab set too low.

Why Choose Jacksonville Professional Concrete

New concrete driveway and sidewalk at a Jacksonville home
  • Licensed & Insured
  • Years of experience pouring residential and commercial concrete
  • Proper reinforcement on every pour
  • Written warranty on workmanship
  • Local crew, local reputation
  • On-time, on-budget completion
  • Free, no-obligation estimates
  • Wide range of finishes
  • Proper site prep and drainage grading
  • Clean job sites


Our concrete slab services in Jacksonville

a house with a garage in the middle of a driveway

New slab installation

For a typical residential slab, we strip topsoil, compact the sand in lifts and lay a polyethylene vapor barrier where the space will be enclosed. Slabs are usually 4 inches thick with wire mesh or a rebar grid, and 5 to 6 inches where heavier loads are expected. Perimeter edges are thickened where walls will bear, and we place control joints so shrinkage cracks follow a straight line.

A concrete driveway in front of a white garage door

HVAC, generator and equipment pads

After a long outage, many homeowners decide to add a standby generator. Those units, along with AC condensers, pool equipment and water heaters, need level pads that stay above standing water. We form pads to the manufacturer's size, raise them above grade and keep them clear of the house wall so service techs can work around the equipment.

the crack in the concrete shows a crack in the road

Garage and workshop slabs

Garage floors carry cars, jacks, toolboxes and sometimes a lift, so we pour them 4 to 6 inches thick with rebar and a vapor barrier. The floor slopes slightly toward the door for washdown and storm runoff. Detached garages and workshops need a building permit through the City's Building Inspection Division, and we pour to the plans and stay on schedule for inspections.

a red and black machine on a sidewalk

Shed and storage building slabs

A prefab shed or storage building needs a flat, square pad that sits above the surrounding grade so rainwater runs away from the doors. We size the slab a few inches larger than the building footprint, thicken the edges and can set anchor bolts or straps for tie-downs. Securing an outbuilding to its slab is worth discussing before hurricane season, not after a storm warning.

a close up view of a stone pavement

Slab replacement

When a slab has sunk, cracked through or been undermined by washouts, we break it out, haul it off and rebuild the base. This is the time to raise the finished height if water has been getting in, add a vapor barrier the original slab never had or enlarge the pad for future use. Replacement also lets us correct drainage around it.

Modern white house, two garage doors, and concrete driveway

Slab repair and patching

Not every damaged slab needs to come out. Spalled corners, surface scaling and small cracks can be patched with repair mortar or sealed with flexible filler. A sunken section may be lifted with leveling methods if the slab is still in one piece. We will tell you honestly whether a repair will last or simply buy time.

How our slab process works

Plan and permit

We confirm the size, the load and the use, check setbacks and any HOA rules, and identify utilities. If the slab supports a structure, we coordinate the permit and work from the approved plans. You get a written estimate listing thickness, reinforcement and vapor barrier details.

Grade and compact

We strip sod and organic soil, bring in clean fill to raise the pad where the water table runs high and compact in lifts. Forms go in level and square, with the top set high enough that water flows away. Vapor barrier and reinforcement go in last, with rebar held up on chairs.

Pour and finish

Ready-mix arrives and is placed, consolidated and screeded to the forms. Garage and shed floors get a smooth trowel finish, while exterior pads usually get a broom texture. During hot months, we pour early and use an evaporation retarder so the surface finishes cleanly instead of crusting over.

Cure and inspect

We wet-cure the slab or apply a curing compound, since heat and wind can dry the top before the concrete below has gained strength. Light foot traffic is fine in a day. Framing and shed setup can usually begin after about a week, and full design strength comes at around 28 days.

Frequently Asked Questions

How much does a concrete slab cost in Jacksonville?

Most residential concrete slabs in Jacksonville, FL cost $8 to $13 per square foot installed. Small pads cost more per foot because forming and mobilization are spread over less area. The price moves with thickness, reinforcement, fill needed to raise the grade, vapor barrier, removal of an old slab and access for the truck. A decorative finish is quoted separately.

How thick should my slab be?

A shed or patio-style pad is usually 4 inches thick. Garage floors and workshop slabs are 4 to 6 inches, with thickened edges where walls bear. Anything carrying a vehicle lift, heavy machinery or an RV may need 6 inches or more with heavier steel, and we follow engineered plans when they are required.

Do I need a permit for a slab?

Slabs for detached garages, workshops, additions and other structures need a building permit from the City of Jacksonville Building Inspection Division. A simple pad for an AC unit or a small prefab shed may have different rules, and HOAs often require approval. Properties outside Duval County or in the beach cities fall under those offices.

How does the high water table affect my slab?

Where the seasonal water table sits close to the surface, a slab poured at or below grade can stay damp from underneath. We raise the pad with compacted clean fill, slope the ground away from it and install a vapor barrier under enclosed slabs. That keeps moisture out of garage floors, shop flooring and stored items.

Can you pour a slab in the summer heat?

Yes, with the right timing. Midsummer afternoons regularly pass 90 degrees, so we start early, keep materials shaded, use an evaporation retarder and cure the surface carefully. Rain is the bigger scheduling factor: an afternoon thunderstorm can mar a fresh finish, so we watch the radar and keep plastic on site to cover the slab.

How long before I can build on my new slab?

Most framing or shed assembly can start after about seven days, once the concrete has gained most of its early strength. Heavy equipment and vehicles should wait closer to 28 days. Your project details may shift those times, and we will give you specific guidance at the end of the job. To get a slab estimate, call (904) 946-5411.